{"id":4229,"date":"2024-09-03T13:56:25","date_gmt":"2024-09-03T10:56:25","guid":{"rendered":"https:\/\/www.pselectric.bg\/?p=4229"},"modified":"2024-11-25T17:14:12","modified_gmt":"2024-11-25T15:14:12","slug":"%d1%84%d0%b5%d1%86-%d0%b7%d0%b0%d1%80%d0%b0%d0%b1%d0%be%d1%82%d0%b8-%d1%81-%d0%bf%d1%8a%d0%bb%d0%bd%d0%b0-%d0%bc%d0%be%d1%89%d0%bd%d0%be%d1%81%d1%82","status":"publish","type":"post","link":"https:\/\/www.pselectric.bg\/en\/%d1%84%d0%b5%d1%86-%d0%b7%d0%b0%d1%80%d0%b0%d0%b1%d0%be%d1%82%d0%b8-%d1%81-%d0%bf%d1%8a%d0%bb%d0%bd%d0%b0-%d0%bc%d0%be%d1%89%d0%bd%d0%be%d1%81%d1%82\/","title":{"rendered":"A photovoltaic power plant started operating at full capacity."},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-4230\" src=\"https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d-225x300.jpg 225w, https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d-600x800.jpg 600w, https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d-768x1024.jpg 768w, https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d-1152x1536.jpg 1152w, https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d-9x12.jpg 9w, https:\/\/www.pselectric.bg\/wp-content\/uploads\/2024\/09\/\u043e\u0442-\u041c\u0438\u043b\u0435\u043d.jpg 1350w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/p>\n<p>\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f\u0442\u0430 \u201e\u041f\u0421 \u0415\u043b\u0435\u043a\u0442\u0440\u0438\u043a\u201c\u00a0 \u0434\u043e\u0441\u0442\u0430\u0432\u0438 \u0442\u0440\u0430\u0444\u043e\u043f\u043e\u0441\u0442 \u0437\u0430 \u043e\u0431\u0435\u043a\u0442 <strong>\u0424\u0415\u0426 <\/strong>\u00a0In the village of Presyaka, Lovech region, a newly constructed photovoltaic power plant (FEC) is now operating at full capacity, thanks to the high-quality delivery and installation of the transformer substation. This project is part of the effort to increase renewable energy sources in the region and significantly contributes to the sustainable development of the local energy infrastructure. The client is satisfied, and work is already underway on their new order for upcoming projects.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f\u0442\u0430 \u201e\u041f\u0421 \u0415\u043b\u0435\u043a\u0442\u0440\u0438\u043a\u201c\u00a0 \u0434\u043e\u0441\u0442\u0430\u0432\u0438 \u0442\u0440\u0430\u0444\u043e\u043f\u043e\u0441\u0442 \u0437\u0430 \u043e\u0431\u0435\u043a\u0442 \u0424\u0415\u0426 \u00a0\u0432 \u0441\u0435\u043b\u043e \u041f\u0440\u0435\u0441\u044f\u043a\u0430, \u043e\u0431\u043b\u0430\u0441\u0442\u00a0 \u041b\u043e\u0432\u0435\u0447. \u041d\u043e\u0432\u043e\u0438\u0437\u0433\u0440\u0430\u0434\u0435\u043d\u0430\u0442\u0430 \u0444\u043e\u0442\u043e\u0432\u043e\u043b\u0442\u0430\u0438\u0447\u043d\u0430\u00a0 \u0446\u0435\u043d\u0442\u0440\u0430\u043b\u0430\u00a0 (\u0424\u0415\u0426) \u0432\u0435\u0447\u0435 \u0444\u0443\u043d\u043a\u0446\u0438\u043e\u043d\u0438\u0440\u0430 \u0441 \u043f\u044a\u043b\u043d\u0430 \u043c\u043e\u0449\u043d\u043e\u0441\u0442, \u0431\u043b\u0430\u0433\u043e\u0434\u0430\u0440\u0435\u043d\u0438\u0435 \u043d\u0430 \u043a\u0430\u0447\u0435\u0441\u0442\u0432\u0435\u043d\u0430\u0442\u0430&hellip;<\/p>","protected":false},"author":3,"featured_media":4230,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_customify_content_layout":"","_customify_sidebar":"","_customify_page_header_display":"default","_customify_disable_header":"","_customify_disable_header_top":"","_customify_disable_header_main":"","_customify_disable_header_bottom":"","_customify_disable_page_title":"","_customify_disable_content_vertical_padding":"","_customify_disable_footer_top":"","_customify_disable_footer_main":"","_customify_disable_footer_bottom":"","_customify_breadcrumb_display":"default","_customify_header_transparent_display":"","footnotes":""},"categories":[6],"tags":[],"class_list":["post-4229","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-portfolio"],"_links":{"self":[{"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/posts\/4229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/comments?post=4229"}],"version-history":[{"count":2,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/posts\/4229\/revisions"}],"predecessor-version":[{"id":4232,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/posts\/4229\/revisions\/4232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/media\/4230"}],"wp:attachment":[{"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/media?parent=4229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/categories?post=4229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pselectric.bg\/en\/wp-json\/wp\/v2\/tags?post=4229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}